Certificate of habitability in Pilar de la Horadada

occupancy certificate Pilar de la Horadada

I can help you with the Certificate of occupancy in the Town Hall of El Pilar de la Horadada. This document is also known as Responsible Declaration of 2nd Occupation and is requested at the Town Hall of El Pilar de la Horadada. To request it, you need a habitability certificate.

Why do you need a Certificate of Occupancy in Pilar de la Horadada?

The procedure previously called Certificate of occupancy has been replaced by the Responsible Declarations of First and Second Occupancy. If a home requires contracting water or electricity services, or is intended to be sold, it will be necessary to submit the Responsible Declaration of Second OccupationThis document serves to renew the old Certificate of Occupancy. Its main purpose is for a technical professional to regularly assess the condition of the home to prevent substandard housing.

What do I need to obtain my Certificate of Habitability or Responsible Declaration of Second Occupation in Pilar de la Horadada?

In the Pilar de la Horadada Town Hall, the certificate of occupancy corresponds to the following procedure:

occupancy certificate Pilar de la Horadada

Request Declaration Responsible for 2nd Occupation

To get the certificate of second occupation the City Council of El Pilar de la Horadada asks for the following documentation:

  • Signed representation mandate that authorizes me as a representative to manage the process.
  • Photocopy of identity document
  • Application according to the established model. downloadable here:
  • Copy of the receipt accrediting having paid the fee for the issuance of the second occupation license.
  • Book of the corresponding Building, when so required by the applicable regulations
  • Physician Certificate (habitability certificate) competent accrediting that the dwelling conforms to the conditions that led to the granting of the first or previous occupation license to which it is requested.
  • Building evaluation report, when required by the applicable regulations

The application has a fee of 30.05 euros per home. (It is not published on the City Council website so it can change)

The Responsible Declaration of Second Occupancy has a fee of 30.05 euros per dwelling. (It is not published on the City Council website so it can change)

I accept bank transfer and bizum as payment methods.

How much will the Certificate of Occupancy cost me in Pilar de la Horadada?

Fees for the Responsible Declaration of Second Occupation

Habitability Certificate Fees 150€
VAT fees Certificate of Habitability31,5€
Filing and monitoring the procedure50€
VAT filing and follow-up of the procedure10,5€
TOTAL242€

Please note that Municipal taxes are not includedOnce you sign the authorization to act on your behalf, I'll request the corresponding payment receipt from the city council and send it to you. You'll have to pay it and send me the receipt so I can include it when submitting the application.

What does the home require to obtain the certificate of habitability?

So that I can sign the habitability certificate, necessary to present the Responsible Declaration of 2nd Occupation in El Pilar de la Horadada It is necessary that the home meets the following minimum requirements:

  • -Have a water heater for domestic hot water.
  • -There must be at least one bathroom equipped with at least: Toilet, sink and shower.
  • -At least one bedroom that is compartmentalized from the rest of the house with a partition and door.
  • -The rooms and living room must be ventilated and illuminated naturally through carpentry with a gap dimension according to the applicable standard.
  • -It must have a complete kitchen with refrigerator, sink and cooking area with smoke extractor, or failing that, it must be attached to a window so that smoke extraction is guaranteed.
  • -There can be no holes in the floor, walls or ceiling.
  • -There cannot be dampness with mold that could cause health problems for the inhabitants of the home.
  • -Windows must be able to close properly and there cannot be broken glass.

This is important, since even if you have the goal of renovating the house, you cannot request the certificate of habitability to register the supplies if the house is not habitable.

An energy efficiency certificate is required to submit the application. If you do not have one, I can arrange one for you as well.

FAQ Frequently asked questions about the Certificate of Occupancy in El Pilar de la Horadada

How long will it take to obtain a certificate of occupancy for my home in El Pilar de la Horadada?

Since this is a Responsible Declaration, the process takes effect immediately. That is, once you register it in your name, the registration form will serve as a substitute for the certificate of occupancy.

What is the difference between the Certificate of Habitability and the Responsible Declaration of First or Second Occupation?

The Certificate of Occupancy, the Responsible Declaration of Second Occupancy, and the Second Occupancy Certificate/License are often used interchangeably; all of these terms are commonly used to refer to the same document. To be able to process this Responsible Declaration, the home must have been legally built and the first Certificate of Occupancy must have been issued at the time.

How do I know if my home previously had a certificate of occupancy in El Pilar de la Horadada?

If you have limited documentation, old water and electricity bills are valid as proof that the home once had a certificate of occupancy.

When does my Certificate of Occupancy expire in El Pilar de la Horadada?

This ID card is valid for 10 years, although it may expire earlier if:
New water and electricity supply contracts will be signed.
The purchase or inheritance of the home is carried out.

Contact me and I will take care of the Certificate of Habitability for your home

1. Send me an email using the form below.

Indicate in the email the address of the home and its cadastral reference.

The cadastral reference can be found in the property deed.

2. I will reply to you in less than 24 hours.

I will send you a quote and propose a day and time for the visit.

To prepare the Certificate of Habitability I will need:

  • property deed
  • Photocopy of ID holder

3. I will visit the home to measure it.

After the visit you must pay me for the service. I accept bank transfer, bizum and cash.

I will give you the invoice along with the finished documentation within a few days.

CONTACT

    If the contact form isn't working, please send me a message to: [email protected]

    Other related services

    Other architecture services

    5/5 - (1 vote)